Back to all Back

Elcho Hut Summer Work Party

We took advantage of the fine weather in the weekend end of January and had a successful work party at Elcho Hut.  Two vehicles and six people.

The new aluminium windows were installed, trim and flashings fitted and painted, wood-shed stocked with firewood, wood burner bolted to the concrete pad, and rodent bait stations fixed in place.

The new windows look good and have tidied the hut, letting more light in and improving the view.  The river was higher than in winter and both vehicles needed towing at times, unfortunately once at the same time.

Posted: 26/02/16

Posted By: Narina Sutherland